* Rate is an estimated low-high range, either provided by the consultant/firm or calculated based on skills, and is not guaranteed.
** Rank is the average of overall ratings from all references requested by a consultant from past clients. The scale is 1-5, with 5 being the highest. A zero ranking usually indicates that no references have as yet been requested.
** Rank is the average of overall ratings from all references requested by a consultant from past clients. The scale is 1-5, with 5 being the highest. A zero ranking usually indicates that no references have as yet been requested.

Primavera Project Scheduler resume search results